Every day, in multiple locations across the world, Mace colleagues deliver exceptional results.
In Summer 2018, our team on site at Battersea Power Station delivered the installation of a massive 62 tonne steel beam. One of the largest pieces of steel to be manufactured in the UK in recent years, the operation to transport it, lift and install required detailed planning and close cooperation with our supply chain, local authorities and police.
I want a better perspective on